13.3.5 Control cable installation
Procedure
1. Remove four M3x10 Pozidriv screws from relay module cover in order
shown.
2. Remove cover from drive.
If cover adheres to drive housing, gently tap to free it.
Do not
prise off
with tools.
3. Ensure gasket is retained within recessed channel on drive housing.
4. Unscrew sealing plugs from relay module cover using 21 mm spanner.
5. Fit new sealing washer onto supplied ½ ” NPT cable gland.
6. Screw supplied ½ ” NPT cable gland with new sealing washers into relay
module cover.
7. Ensure cable gland retaining nut is properly seated.
8. Use 21 mm spanner to tighten gland to 2.5 Nm to ensure ingress rating.
If different gland used, it must be IP66 rated.
13 INSTALLATION: PART 4 (CONTROL CONNECTIONS AND WIRING)
96