9. Loosen, but do not remove the gland cap.
10. Insert control cable into loosened gland.
11. Pull through sufficient cable to reach the connectors required, leaving a
little slack.
12. Strip the outer sheath as necessary.
13. Remove 5 mm of insulation from conductors. No tinning/ferrule required.
14. Whilst depressing sprung terminal button, push bare cable end into
terminal.
15. Release terminal button to clamp wire.
16. Prepare the cable screen(s) by twisting a suitable length. The twisted
length(s) shall ideally be sleeved to prevent shorting.
17. Secure the end of the cable screen to the Faston receptacles on the spade
connector provided.
18. When all conductors in position replace the module cover.
19. Check gasket and replace if damaged.
IMPORTANT: Gasket ensures IP66 (NEMA 4X) protection.
20. Hold relay module cover in place. DO NOT disturb sealing strip.
21. Tighten four M3x10 Pozidrive screws to 2.5 Nm in order shown.
13 INSTALLATION: PART 4 (CONTROL CONNECTIONS AND WIRING)
97