![waratah FL85 Operator'S Manual Download Page 45](http://html2.mh-extra.com/html/waratah/fl85/fl85_operators-manual_3353669045.webp)
Maintenance: Initial Set-up
AM24480,0000350 -19-06SEP21-1/1
Charging the air tank
1. Remove the large air inlet cap (2) from the air inlet (1).
2. Remove the small air inlet cap (3) from the valve.
3. Connect the air pump nozzle (4) to the valve; charge
the air tank to specification.
Specification
Air tank maximum
pressure
.......................................................... 1379 kPa
13.8 bar
200 psi
4. Remove the air pump nozzle from the valve.
5. Re-install the small air inlet cap.
6. Re-install the large air inlet cap.
IMPORTANT: Ensure you replace both inlet caps
properly; debris can build up in the air
inlet, allowing air to leak from the air tank.
Without the proper air pressure, the saw
bar will not function properly.
1— Air inlet
2— Large air inlet cap
3— Small air inlet cap
4— Air pump nozzle
2
1
TX1044693
—UN—25JUN08
3
1
TX1044695
—UN—25JUN08
4
1
TX1044697
—UN—25JUN08
3-2-2
090621
PN=45
Summary of Contents for FL85
Page 4: ...Introduction 090621 PN 4...
Page 79: ...Index Index 3 090621 PN 79...
Page 80: ...Index Index 4 090621 PN 80...