18
••••
Installation
XX002 Rev 799 Surveyor99 Dome System
NOTE: Connectors that do not fit through the Strain Relief Fitting must be cut off and re-terminated after
passing the cable through. It is recommended to pass any RJ-45 Connectors through the fitting first.
BNC type connectors do not fit through the fitting and must be terminated later.
4. If cables are channeled through Flexible Conduit:
a) Route approximately 9 inches (229 mm) of Conduit cables through the Conduit Fitting.
b) Insert the end of the Flexible Conduit Pipe into the Conduit Fitting and tighten the Clamp Screw.
NOTE: Connectors that do not fit through the Conduit Fitting must be cut off and re-terminated after passing
the cable through. It is recommended to pass any RJ-45 Connectors through the fitting first. BNC type
connectors do not fit through the fitting and must be terminated later.
5. Terminate all the cables as follows (refer to Figure 17):
a) Remove Terminal Blocks TB1 and/or TB3. Since the control signals exist in both TB3 and J3, do not
remove TB3 if J3 will be used for control signal wiring.
b) Strip approximately 1 inch (25 mm) of insulation off all wires to be terminated in Terminal Blocks.
Then strip approximately 0.25 inches (6 mm) of insulation off of each individual wire.
c) Make all connections to Terminal Blocks TB1 and TB3 with reference to Table 1. On TB3, the
COMMAND IN + (CI+) and COMMAND IN - (CI-) connections must be used for Simplex operation.
For Half Duplex operation, the additional signals RESPONSE OUT + (RO+) and RESPONSE OUT -
(RO-) must also be used. Insert each wire into its proper Terminal Block location and tighten each
screw.
d) Terminate the video (coaxial) cable with a BNC type male connector.
e) Terminate the 8-conductor alarm cable or communication/relay cable with an RJ-45 male connector, if
connectors J2 and J3 will be used.
WARNING: If Vicoax mode is being used, DO NOT wire TB3 or J3 with control signals, as this will cause
the Camera Dome Program to lock up upon power-up.
6. Reinstall the Terminal Blocks TB1 and TB3 into the Communication Power Supply Board at the proper
block frames.
7. Install the Video BNC cable connector to the Communication/Power Supply Board’s mating BNC
Connector at location J1.
8. Plug in all RJ-45 cable connectors to their corresponding mating connectors J2 and J3. All cables should
be carefully looped around to prevent the excess cable from bending sharply and breaking later.
WARNING: Failure to insert the RJ-45 Connectors into the correct mating connectors can cause damage
to the Communication Power Supply Board upon power-up.
Summary of Contents for Surveyor 99
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...