6
••••
Installation
XX002 Rev 799 Surveyor99 Dome System
8. Insert Camera Drive into Enclosure, carefully aligning Captive Screws and mating standoffs. Tighten 3
Captive Screws.
9. Attach Lower Dome and power-up. Refer to the Maintenance Section for Lower Dome handling.
This Surveyor99 is shown with typical wiring and configuration using Flexible Conduit. See Figure 4. The DIP
switches are set as follows:
DIP SWITCH S1 (Surveyor99 address):
1 - ON, 2 - OFF, 4 - OFF, 8 - OFF, 16 - OFF, 32 - OFF, 64 - OFF, 128 - OFF (THIS IS ADDRESS 1)
DIP SWITCH S2 (Surveyor99 configuration):
1 - ON (NTSC), 2 - OFF (VPS), 3 - OFF (DUPLEX), 4 - OFF (RS-422), 5 through 8 - OFF (not used)
Figure 4
Close-Up View - In-Ceiling Configuration with Flexible Conduit
Summary of Contents for Surveyor 99
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...