20
••••
Installation
XX002 Rev 799 Surveyor99 Dome System
3. Set switch 2 on DIP Switch 2 (S2) to the OFF position (VPS/NOVA mode).
4. Set switch 3 on DIP Switch 2 (S2) to the appropriate communication mode (SIMPLEX/DUPLEX).
5. Set switch 4 on DIP Switch 2 (S2) to the appropriate communication protocol (RS-422 or RS-485)
position as specified in Table 2.
b) If Vicoax Mode will be used:
1. Set switch 1 on DIP Switch 2 (S2) to the appropriate video mode (PAL or NTSC).
2. Set switch 2 on DIP Switch 2 (S2) to the ON position (Vicoax mode).
3. Set switch 3 on DIP Switch 2 (S2) to either position, as it does not affect Vicoax protocol
operation.
4. Set switch 4 on DIP Switch 2 (S2) to either position, as it does not affect Vicoax protocol
operation.
NOTE: DIP Switches labeled ON or CLOSED and OFF or OPEN have the same meaning.
10. Lift the Lower Dome up to the Surveyor99 and line
up the molded tabs on the Lower Dome with the
recesses on the inner Enclosure. There are only 2
ways to align it. Refer to Figure 18.
11. Press the Lower Dome into the Surveyor99 and
verify that it snaps into place on both sides. The
upper edge of the Lower Dome should be flush
with ceiling plane. If not, it may be necessary to
tighten the Ceiling Clip Screws slightly to bring the
Surveyor99 closer to the ceiling plane.
12. Proceed to the Operation Section of this manual.
Figure 18
Final Assembly, Ceiling Mount Version
Summary of Contents for Surveyor 99
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...