XX002 Rev 799 Surveyor99 Dome System
Operation
••••
47
4. Press the PP ENTER key again. The PRESET LED display remains with the number 95. The monitor will
display the power-up test screen (Figure 40) for the duration of its initial testing.
5. The Surveyor99 then switches to the opening screen (Figure 41). This screen will display the Camera
Dome Program version, current date/time, the current address and a request to send communications to
baud detect. Move the joystick or press buttons to send commands and commence auto-baud detect.
Troubleshooting
If the Surveyor99 does not power-up correctly, check the following:
⇒
Verify, with a voltmeter, that 22 to 34 VAC is measured across TB1, pins 1 and 2. If not, check the integrity
of the power wiring. If less than 22 VAC is measured, it is probable that the power cable length is too long.
Check the maximum usable cable distance for the voltage input as stated in Table 6 of the Technical
Information Section. If 22 to 34 VAC is measured, return the Surveyor99 back to factory for service in
accordance with the Shipping Instructions Section of this manual.
⇒
If the last screen displays and does not disappear, the Surveyor99 is not communicating with the control
device. Verify that the Surveyor99 address is selected on the control device. Sometimes moving the
joystick can begin communication. If communication cannot be established, check the integrity of the
control signal wiring. If all wiring is correct, swap the Camera Drive and re-check. If the new Camera Drive
communicates, return the Surveyor99 back to the factory for service in accordance with the Shipping
Instructions Section of this manual.
⇒
If the Surveyor99 is intermittently operational or operating independently it is possible that the
communications (control) wiring is incorrect. Re-check proper placement of the Control and Response
signals on the Terminal Block or RJ-45 Connector. Also, verify that S2, switch 3 is set for Half Duplex in a
Half Duplex wired Surveyor99.
Summary of Contents for Surveyor 99
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...