16
••••
Installation
XX002 Rev 799 Surveyor99 Dome System
2. Set switch 2 on DIP Switch 2 (S2) to the ON position (Vicoax mode).
3. Set switch 3 on DIP Switch 2 (S2) to either position as it does not affect Vicoax protocol operation.
4. Set switch 4 on DIP Switch 2 (S2) to either position as it does not affect Vicoax protocol operation.
NOTE: DIP Switches labeled ON or CLOSED and OFF or OPEN have the same meaning.
11. Carefully align the 3 Camera Drive Captive Screws with their mating standoffs and insert the Camera
Drive into the Enclosure. When seated, tighten the 3 Captive Screws.
14.
Lift the Lower Dome up to the
Surveyor99 and line up the 2 molded
tabs on the Lower Dome with the 2
recesses on the inner Enclosure.
Refer to Figure 15. There are only 2
ways to align it. Verify that it snaps
into place on both sides. The upper
edge of the Lower Dome should be
flush with ceiling plane. If not, it may
be necessary to tighten the Ceiling
Clip Screws slightly to bring the
Camera Dome closer to the ceiling
plane.
15. Proceed to the Operation Section of
this manual.
Figure 15
Final Assembly, Ceiling Mount Version
Summary of Contents for Surveyor 99
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 38: ...28 Installation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 48: ...38 Wiring XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 52: ...42 Configuration XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 54: ...44 Disassembling the Surveyor99 XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 58: ...48 Operation XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 60: ...50 Maintenance XX002 Rev 799 Surveyor99 Dome System NOTES...
Page 62: ...52 Shipping Instructions XX002 Rev 799 Surveyor99 Dome System NOTES...