![Vicon RV 4116 Operation And Maintenance Manual Download Page 77](http://html1.mh-extra.com/html/vicon/rv-4116/rv-4116_operation-and-maintenance-manual_1012900077.webp)
4
83-004-0.
fm
ID
M
English
-
71 -
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
General information about the machine
Part 2
PUTTING THE MACHINE INTO SERVICE
59
Before using the machine after a long period of inactivity, carefully check
that the main components are working correctly.
In particular:
–
Check the wearing condition and the pressure of the tyres.
–
Check possible loss of liquids.
–
Check the general conditions of the hydraulic hoses.
–
Check the efficiency of all safety devices.
–
Check the oil level in the centralised lubrication system and, if nec-
essary, fill it up.
–
Lubricate all greasing points.
–
Carry out all the necessary maintenance operations.
–
Check that the cardan shaft is correctly installed; furthermore, all pro-
tections must be undamaged and effective.
–
Check the tightening of the fastening screws for the main devices
(drawbar, towing eye, and wheel fastening nuts).
–
Couple the machine to the tractor (See "How to couple the machine
to the tractor").
–
Simulate some test manoeuvres to check coupling, correct operation
of the controls and functionality of operator units.
SPECIAL MAINTENANCE
60
–
Although the machine was designed and built to work in difficult en-
vironmental conditions, after a few years special maintenance must
be carried out to preserve perfect efficiency and guarantee general
safety.
–
The aforesaid interventions must be carried out by personnel with
precise technical skills, in workshops that are suitably equipped and
authorised by the manufacturer.
–
The flexible hoses in the hydraulic system must be replaced every 6
years from the date of production. These components are subjected
to stress due to ageing.
INSTRUCTIONS FOR PART REPLACEMENT
61
Caution
Precaution
Except in case it is expressly specified, every intervention must be
performed with disengaged PTO and tractor engine off; further-
more, the ignition key must be removed and kept by the driver. The
personnel that are authorised to perform the interventions must
comply with all precautions that are necessary to assure the safety
of the people involved, in compliance with the requirements estab-
lished by the laws in force about occupational safety.
Before carrying out any replacement operation, activate all safety devic-
es and, if necessary, instruct the staff working on the machine or nearby.
Summary of Contents for RV 4116
Page 2: ......
Page 44: ...IDM 21720307900 pdf General information about the machine 483 004 0 fm IDM English 38 Part 2...
Page 131: ...483 004 0 IDM 125 English Part 8 Attachments...
Page 133: ...IDM 48300401100 pdf 483 004 0 IDM 127 Attachments English Part 8 ESD A01...
Page 137: ...483 004 0 IDM 131 Attachments English Part 8 ESD A05 CAN CABLE 1 IDM 48300101800 pdf...
Page 151: ...483 004 0 IDM 145 Attachments English Part 8 IDM 48300401700 pdf HSD A01...
Page 153: ...483 004 0 IDM 147 Attachments English Part 8 IDM 48300401800 pdf HSD A02...
Page 155: ...483 004 0 IDM 149 Attachments English Part 8...
Page 162: ......
Page 164: ......
Page 168: ...483 011 0IX fm IDM English 2...
Page 192: ......