WIC and Generator Combo Platform Installation
WIC and Generator Combo Helical Platform Installation (P/N D1000-0010-0122)
This platform is designed to be installed on helicals and it accommodates both the WIC and all ATT approved
generators. Stairs can be mounted on either side and the WIC can be mounted in any direction to support any
site layout. WIC, generator, conduits, cabling, Raycaps, etc. is installed at WWT so a completely configured
platform can be installed at the site. Simply install the helicals in the ground then lift and set the platform onto
the helicals. Platform includes a rodent guard for generators that need it which is also installed at WWT if the
generator is installed at WWT. If Generator is installed at the site, see “Generator Wings Installation Procedure”.
See
WIC and Generator Combo Helical Platform Installation Procedure
1.
Assemble the universal driving tool on the correct Kelly bar adapter.
2.
Connect Kelly bar adapter to Kelly bar on the drive head.
3.
Move drive tool assembly to first helical and attach universal driving tool to helical plate paying attention
to keeping the Kelly bar as centered in the helical as possible. The leveling hardware can be used for
this temporary attachment.
4.
Lift helical upright allowing it to swing free of the ground.
5.
Maneuver the helical directly over the installation point.
6.
Lower the helical until the point of the helical is forced into the ground on target.
7.
Screw helical 12 inches into the ground and plumb using a level on 2 sides 90 degrees from each other.
8.
Continue screwing the helical into the ground while correcting the Kelly bars orientation so the helical
embeds itself straight. A ground man can be of assistance in keeping the foundation plumb during the
installation.
9.
Drive the helical until the top of the helical plate is 7 inches above grade. Stop the driving tool assembly.
Disconnect the universal driving tool from the helical plate.
10.
Repeat steps 3 through 9 for all helicals paying attention to helical plate orientations and to accomplish
74 inch and 99 inch centers between all four helicals.
11.
Install leveling hardware in each helical. Each helical has four sets of leveling hardware and each set of
leveling hardware consists of one threaded rod, four nuts, eight washers, and four lock washers. Leave
the top washer, lock washer, and nut off until platform is set.
12.
Lift and set the platform onto the leveling hardware and level the platform.
13.
Install the top washer, lock washer, and nut on all threaded rods to secure the platform.
14.
Install the WIC stairs on the WIC using the provided hardware.
15.
Install the stairs for the generator area of the platform using the provided hardware.