WIC Concrete Pier/Pad Foundation Kit Installation (P/N D1007-0000-0012)
Concrete Pier Installation Considerations
1.
Height of concrete piers must be constructed to grade level. If grade is not level, maintain an 18 inch
height between grade and the WIC base on the side with the door. The 18 inch height is required for the
stairs to mount properly.
2.
Depth of concrete piers must be determined by region and take into consideration such items but not
limited to depth of frost line, soil type, general climate conditions, and site drainage.
3.
4000 PSI concrete strength should be considered as a minimum type of pier construction, but can vary
based on local architectural standards and approvals.
4.
Maximum pier diameter: 30 inches
5.
Minimum pier diameter: 18 inches.
6.
Anchor bolts can be installed in the concrete pier when it is poured or drilled in afterwards. If installed
when concrete is wet, the bolt hole size and placement is 1.125 inch diameter, 5.5 inch radius, 7.75 inch
centers. Be sure to align all four corners in all four piers as best as possible. Anchor hardware could be
anything between a 5/8 inch anchor (would need washers) to a 1 inch anchor (no washers needed).
7.
WIC fully loaded is 6500 lbs.
8.
Each corner assembly in the Concrete Mount Foundation Kit is 130 lbs; 45 lbs for the corner plate, 81 lbs
for the 11 inch extension and the rest is hardware.
Existing Concrete Pad Considerations
1.
Concrete area should be a minimum of 104" x 104" if the concrete is at grade level. This leaves one foot
around the base of the WIC and does not accommodate the stairs.
2.
Concrete area should be a minimum of 104" x 128" if above grade to accommodate for the stairs.
3.
WIC fully loaded is 6500 lbs.
4.
Each corner assembly in the Concrete Mount Foundation Kit is 130 lbs; 45 lbs for the corner plate, 81 lbs
for the 11 inch extension and the rest is hardware.
WIC Concrete Pier/Pad Foundation Kit Installation Procedure
1.
Center each 11 inch extension on each concrete pier. Maintain 67.125 inches center to center for each 11
inch extension.
2.
Install leveling hardware in the center on each 11 inch extension. Each 11 inch extension has one set of
leveling hardware and each leveling hardware consists of one threaded rod, four nuts, eight washers, and
four lock washers.
3.
Install the four corner plates on the leveling hardware, one in each corner.
4.
Level and secure all the leveling hardware on the corner plates and 11 inch extensions, paying attention
to 67.125 inch centers. The leveling hardware should not be installed outside the 3 inch radius of the
helical pipe. The corner plates have elongated holes for 2 inches of play. There is a lot of room for
adjustments to accomplish the 67.125 inch centers. See
. The top of the extensions are the
same as the helicals, so see