Vertiv
|
XTE 802 Series Walk-In-Cabinet (WIC) Description & Installation Manual (631-205-434)
|
Rev. D
48
INSTALLATION CONSIDERATIONS
NOTE!
If holes are drilled into the exterior of this WIC and not filled using a seal tight connector, the
manufacturer’s warranty will be void.
Important Safety Instructions
DANGER!
Adhere to the “Important Safety Instructions” presented at the front of this document.
Installation Overview
The following is the recommended sequence for the installation and start-up procedures. The sequence may
change according to job and site conditions.
•
Ensure all site drawings and approvals are in place.
•
Obtain the recommended tools and test equipment.
•
Read “Important Safety Instructions” starting on page 7 carefully.
•
Check that all the equipment and materials have been delivered.
•
Proceed with the physical installation of the WIC.
•
Install and verify ground cables.
•
Install and verify the AC power.
•
Install and verify the DC power.
•
Route, splice, and verify the OSP cables.
•
Install and verify the alarm cables.
•
Install and verify the batteries.
•
Turn-up, verify, and adjust the system.