Vertiv™ XTE 601E Series Equipment Enclosures Description and Installation Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
17
3
Sequence of Procedures
3.1
General
The procedures listed in Table 3.1 are required to be performed in the order listed to fully install the enclosure.
Other practices and manufacturer’s documents will be required to complete the installation of the system. This includes, but is not
limited to:
•
Set-up and maintenance of:
-
rectifiers, converters, and controllers (if equipped).
-
batteries.
•
OSP cable fishing, sealing, grounding, splicing, and termination.
•
Refer also to…
-
SD-2019015-01 (Enclosure schematic drawings).
-
J-2019015-01 (Enclosure job drawings)
-
SD-2019016-01 (Enclosure schematic drawings).
-
J-2019016-01 (Enclosure job drawings)
Table 3.1
Sequence of Procedures
Section in this Document
Starting on Page
Description
Provides information that will help the project engineer determine an appropriate use and location for
the enclosure.
Describes how to access the internal compartments of the enclosure (equipment, battery, and cable
entry compartments). Also provides a door hinge side reversal procedure.
Provides installation overview, recommended tools and test equipment, required installation materials,
and recommended enclosure anchors.
Describes the transportation and storage requirements, the safe handling of the enclosure, and the
procedures to install the enclosure on a pad.
Provides methods for sealing the primary equipment compartment cable entries.
Describes the grounding requirements for the enclosure.
Provides wiring information for the electrician.
Provides information regarding the DC power system and distribution.
Provides procedures for preparing the cable sheaths and routing the cables within the enclosure.
Describes the wiring for the enclosure alarms.
Provides information and installation instructions for the various models of batteries used in the
enclosure.
Describes the power up sequence for the AC power, the DC power, and the batteries.
Describes the operation of the F2019015 enclosure Environmental Control Unit (ECU) and thermal
components.
Provides maintenance, troubleshooting, and replacement information.