Vertiv™ XTE 601E Series Equipment Enclosures Description and Installation Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
44
9
AC Power
9.1
Safety Precautions
DANGER!
RISK OF ELECTRICAL SHOCK, GENERAL
All ground connections must be installed and verified, prior to connecting any power cables (AC or DC) and turning-up of
enclosure.
Before installation, the AC grounding electrode system must be bonded to an AC main service power neutral/ground bus.
Contact your local power company or local practices for information about codes or restrictions for your installation.
When connecting any discrete power connection, make the connection first with the ground/return and break last with
ground/return.
Remove rings, metallic wrist bands, or bracelets, etc.
DANGER!
RISK OF ELECTRICAL SHOCK, AC
Proper actions, include, but not limited to:
Verify before contacting the enclosure that no current leakage or ground fault condition is present.
Verify a proper ground is in place.
Verify for AC hook-up, all enclosure circuit breakers are OFF and the utility incoming feed is OFF.
Use a trained licensed electrician.
DANGER!
ELECTRICAL HAZARD
Observe all safety precautions as specified by local building codes and the National Electrical Code (NEC). All procedures
should be performed by a licensed electrician. If local building codes specify procedures different from those in this section,
follow local codes.
9.2
Enclosure Schematic
The complete system schematic is included with each enclosure.