Vertiv™ XTE 601E Series Equipment Enclosures Description and Installation Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
38
Figure 6.5
Lifting the Enclosure
6.12
Placing the Enclosure
ALERT!
During lifting and placement, the enclosure must be lowered so that the enclosure is level and parallel to the pad
surface. Place the enclosure so that it lines up with the anchors. Make sure the enclosure is clear of the conduits in the
foundation pad.
Perform the following procedure to pad or platform mount the enclosure.
Procedure
NOTE!
Refer to Figure 6.6 when using the optional pour-in-place pad template. Refer also to Enclosure Conduit Entry
Options” on page 34 before placing the enclosure.
1.
Lower the enclosure to approximately 6” above the pad, level and parallel. The enclosure should be lowered towards the
front of the enclosure’s final placement, out of the way of all OSP cables that may be present.
2.
Shift the enclosure, to the rear, over the final mounting location.
3.
As the enclosure is moved into place, verify the enclosure clears cables and conduit.
4.
Verify the barrier pad is in place and the enclosure is directly over the mounting holes. It will be easiest to confirm the
alignment of enclosure and pad mounting holes, using the holes in the rear of the enclosure.
5.
Slowly lower the enclosure in place, until it firmly rests on the pad. Keep the slings on, with a little slack.
Typical sling
arrangement
Shackle
Direction
of pull
The angle
between the sling
cables and the top
of the cabinet shall
not be less than 45°
Shackle
Never use the sling without
clevises or shackles as this
may break the eyebolts
Top of Cabinet
eyebolts