6.9
Preparing the Concrete Pad
Procedure
1.
Clean all debris from the concrete pad or the platform where the enclosure will be placed.
2.
If still present, remove any jig alignment tool, bolts, etc.
3.
Make sure the four (4) enclosure anchor holes are present and usable before the enclosure is placed. The holes may be
more easily located using an optional re-usable drill template.
NOTE!
The size of the re-usable drill template matches the perimeter of the enclosure base perfectly. While drilling the
anchor holes, use a wax or paint crayon to mark the four edges of the drill template. This will later serve as a guide for
placing the rubber barrier pad and aligning the enclosure during placement.
4.
From the accessory kit, place the rubber pad (barrier) onto the concrete base, passing any cable present through the
appropriate hole in the pad.
NOTE!
If not already done, remove the perforated cutout for the cables from the rubber pad.
NOTE!
If necessary use tape, such as duct tape, to temporarily hold the edges of the rubber pad down.
5.
Dress any cables/conduits so they will easily enter the enclosure as it is being lowered onto the foundation pad.
6.
If present, remove the anchor bolts and washers from the foundation pad. Set the hardware aside to attach the enclosure to
the pad.