Vertiv™ XTE 601E Series Equipment Enclosures Description and Installation Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
45
9.3
AC Input Connections
Important Safety Instructions
DANGER!
Adhere to the “Important Safety Instructions” presented at the front of this document.
The enclosure requires separate AC feeds for the GFCI outlet and optional AC battery heater kit (p/n 565616). The AC feed is
connected directly to the GFCI outlet.
NOTE!
If a DC power system is installed in the enclosure, refer to the instructions provided with the DC power system for AC
input connection details.
Make connections per the current edition of the American National Standards Institute (ANSI) approved National Fire Protection
Association's (NFPA) National Electrical Code (NEC), and applicable local codes.
The following procedure shall be performed by a trained electrician.
Procedure
1.
Use a non-contact voltage detector to verify the enclosure is safe.
2.
Verify that the enclosure is properly grounded.
3.
Verify that all breakers feeding the enclosure and all breakers within the enclosure are in the OFF position.
4.
Refer to the schematic drawings shipped with your enclosure for a detailed AC wiring diagram. See also Figure 9.2.
5.
Remove the rear access panels. See “Removing/Installing Rear Access Panels” on page 22.
6.
Determine the AC cabling route into the enclosure for your installation site. There are knockouts located on the lower rear
access panel, the enclosure sidewalls, and also knockouts on the rear enclosure floor. Refer to Figure 9.1. Refer also to
“Enclosure Conduit Entry Options” on page 34.
7.
Pull the AC power and ground cables into the enclosure. Refer to Figure 9.1 and Figure 9.2.
You will need one (1) 120 VAC, 15 A circuit to feed the GFCI outlet.
You will need Optional Battery Heater Kit (565616).
8.
Connect the above feed per Figure 9.2.
9.
After cables are installed, refer to “Sealing Primary Equipment Compartment Cable Entries” on page 42 and seal all cable
grommets and cable entry points.