58
Vanmaster, Unit 5 Stone House Road, Martland Park, Wigan WN5 0LE
www.vanmaster.net | [email protected]
Make sure the cable is fed through the cut out in the door.
The door can now be closed and locked.
Site 230V Supply Point:
Remove any cover from the socket outlet provided at the site supply point,
and connect the plug at the other end of the supply flexible cable to this.
Switch on the main switch (if any) at the site supply point.
Generator/Charger
When connecting to a generator, always switch off the RCD, start the
generator and allow it to run for a few minutes to stabilise.
When this has happened, switch the RCD to the ON position.
To Switch on Power:
Switch RCD main isolation switch in Caravan to the ON position.
Note: The RCD unit is normally located in the offside (inside) front floor
locker.
Caution: It is advisable to check the supply rating before switching on two
loads (items) greater
than the supply as this cause
overload and
the circuit
breaker to trip.
If 12V power is required, switch on main 12V isolation switch adjacent to the
entrance door.