43
2018/02
TBPN-L1
-FDIO1-2IOL- Saf
e
I/O
7
Commissioning
7.1
Initial Commissioning
7.1.1
Mounting and Electrical Installation
Please assure the proper closing of the protective cover over the rotary coding switches, see
.
Mount TBIP-Lx-FDIO1-2IOL according to the instructions in
.
Connect the device to Ethernet according to
Connecting the Devices to Ethernet
Connect the power supply cabling according to
.
Connect the sensors and actuators depending on the function (
)
according to
Connecting Sensors and Actuators
.
Seal unused connectors with the respective protection caps,
chapter 5.1.1, Assuring Protec-
Connecting the Supply Voltage
Before the operating voltage is applied, assure that:
–
no wiring or grounding errors exist
–
a safe grounding of the device/of the application is guaranteed.
Connecting the supply voltage
After the supply voltage is applied, check if all supply voltages as well as the output voltage are
in the permitted range.
Check if the device works properly or if errors are displayed by controlling the diagnostics an sta-
tus displays
7.1.2
Setting the IP Address
Set the first three bytes of the IP address for the safety side of the device as well as the IP address
for the non-safety side of the device via the device's web server.
Set the last byte of the IP address for the device's safety side via the 3 rotary coding switches.
Summary of Contents for TBIP-L...-FDIO1-2IOL Series TBIP-L4-FDIO1-2IOL
Page 1: ...Your Global Automation Partner TBIP L FDIO1 2IOL Safety Block I O Module Instructions for Use...
Page 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...
Page 118: ...Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com 2...