Configuring with Turck Safety Configurator and Rockwell Studio 5000
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
52
Checking the Configuration
Confirm the "Information" dialog with "OK" and confirm the configuration validation in the dia-
log box "Configuration validation".
Enter the name of the authorized person who is in charge of the validation and enter a password.
Fig. 25: Configuration release
The configuration log is part of the safety documentation of the machine.
Copy the plain text log to a text editor, save, print and archive it.
or
Save the configuration log as text file via "Monitor operations
configuration log
save as...",
print and archive it.
HINWEIS
Chapter 5.8 of the software's online help contains a detailed description of the structure
of the configuration log.
Fig. 26: Releasing the Configuration
Closing the dialog box with "Yes" activates the protective operation of the device (safety moni-
tor). The device is started.
After the configuration release, the device is in diagnostics mode.
HINWEIS
The CIP Safety section at the end of the configuration log contains the CIP Safety Config-
uration Signature with ID and time stamp which have to be entered in the EtherNet/IP™
PLC software, s.
Assigning the Configuration Signature (page 75)
.
Summary of Contents for TBIP-L...-FDIO1-2IOL Series TBIP-L4-FDIO1-2IOL
Page 1: ...Your Global Automation Partner TBIP L FDIO1 2IOL Safety Block I O Module Instructions for Use...
Page 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...
Page 118: ...Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com 2...