J355HA M50
Translation of the original instructions
Page 1: ...J355HA M50 Translation of the original instructions...
Page 2: ...ht FAAC S p A ab dem 2015 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespeichert an Dritte weitergegeben oder sonst auf eine beliebige Art in einem beliebigen Format und mit...
Page 3: ...g from misuse or any use other than that for which the automated system is intended 7 Do not install the equipment in an explosive atmosphere the presence of flammable gas or fumes represents a seriou...
Page 4: ...tic hydraulic counter terrorism traffic bollards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High po...
Page 5: ...imum lowering time sec 2 Operating temperature C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser...
Page 6: ...on of the original instructions ENGLISH 2 INSTALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensi...
Page 7: ...7 532141 Rev A Translation of the original instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods...
Page 8: ...s purpose inside the metal pit 1 10 and the electronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow th...
Page 9: ...ons Class C30 37 Concrete with aggregate 10 30 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil...
Page 10: ...ngth Thecablesmustbelaidinsideasheathof 50mmandpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the...
Page 11: ...9 2 After you have fully inserted the bollard resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMP...
Page 12: ...ver in place 12 2 Remove the top cover 3 UnscrewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthel...
Page 13: ...UP Limit switch DOWN Limit switch common EFO pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection volu...
Page 14: ...ou reach the b6 parameter 6 Set the value b6 Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on progra...
Page 15: ...UT 3 GND GND 24 V 24 V OUT 3 OUT 4 GND OPEN A STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 1...
Page 16: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com J355HA M50 16 532141 Rev A...