background image

12

 

10

 

9

 

11

 

J355HA  M50 

11 

532141        -  Rev.  A

19

50 Nm

2

1

1

1

Tr

ansla

tion of the original instruc

tions

ENGLISH

2.5  INSERTION INTO THE PIT

Before inserting the bollard into the pit, complete the electrical 
connections as shown in §2.4 and §3.1, check that these function 
correctly, and also check the function of the safety devices (see "JE275 
ELECTRONIC EQUIPMENT" 

13

).

In order to position the bollard in the pit (wait for at least 7 days for 
the concrete to cure), remove the safety bar, pulling the cotter pin 
out first 

9

-

then the bar 

9

-

2

.

After you have fully inserted the bollard, resting it against the coun-
terframe, remove the two eye bolts 

11

-

1

 and fix the bollard in place 

using the 24 TCEI M24x50 screws supplied with the pit.

 

!

IMPORTANT: Tighten the screws to a torque of 

50Nm

2.6  FIXING THE TOP COVER

After fixing the bollard in place, complete the installation by position-
ing and fixing the top cover with the six M8x40 steel screws provided.

Screw the two male M20 eye bolts onto the upper part, as shown 
in

10

, using them as hooking points for lifting with belts or chains.

Raise the bollard and place fully into the pit.

During this phase, take care to position the corrugated conduits 
correctly so that they are not pinched between the pit and the bol-
lard frame

Summary of Contents for J355HA M50

Page 1: ...J355HA M50 Translation of the original instructions...

Page 2: ...ht FAAC S p A ab dem 2015 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespeichert an Dritte weitergegeben oder sonst auf eine beliebige Art in einem beliebigen Format und mit...

Page 3: ...g from misuse or any use other than that for which the automated system is intended 7 Do not install the equipment in an explosive atmosphere the presence of flammable gas or fumes represents a seriou...

Page 4: ...tic hydraulic counter terrorism traffic bollards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High po...

Page 5: ...imum lowering time sec 2 Operating temperature C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser...

Page 6: ...on of the original instructions ENGLISH 2 INSTALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensi...

Page 7: ...7 532141 Rev A Translation of the original instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods...

Page 8: ...s purpose inside the metal pit 1 10 and the electronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow th...

Page 9: ...ons Class C30 37 Concrete with aggregate 10 30 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil...

Page 10: ...ngth Thecablesmustbelaidinsideasheathof 50mmandpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the...

Page 11: ...9 2 After you have fully inserted the bollard resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMP...

Page 12: ...ver in place 12 2 Remove the top cover 3 UnscrewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthel...

Page 13: ...UP Limit switch DOWN Limit switch common EFO pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection volu...

Page 14: ...ou reach the b6 parameter 6 Set the value b6 Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on progra...

Page 15: ...UT 3 GND GND 24 V 24 V OUT 3 OUT 4 GND OPEN A STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 1...

Page 16: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com J355HA M50 16 532141 Rev A...

Reviews: