Installation Instruction

CURTIS DC Series Motor Controller Assemblage

1. Checking the controller assemblage, battery system and motor:

a) The whole assemblage status

b) Installation kit & mating connectors

c) Battery charging status

d) Motor status (turning manually 2-3 rounds)

e) The cables’ length and insulation conditions

2. Preparing the mating connectors (please identify the wire number corresponding to the

connectors on assemblage and throttle, as shown in the diagram):

a) Throttle connector:

i.

If there is a throttle switch before the key switch, link the No. 3 wire to the throttle

switch output; If not, link the No.3 wire to the key switch output

ii. Link the No.4 wire to the Forward / Reverse switch “Power In” terminal (possibly

marked as “B+” or “Input”, please verify your F / R switch codification)

iii. Link the No.1 wire to the assemblage mating connector No.6 wire

iv. Link the No.2 wire to the assemblage mating connector No.2 wire

b) Assemblage connector:

i.

Link the No.1 wire to key switch input terminal

ii. Link the No.2 wire to the throttle mating connector No.2 wire

iii. Link the No.3 wire to the key switch output terminal

iv. Link the No.4 wire to F / R switch Forward output terminal

v.

Link the No.5 wire to the key switch output terminal

vi. Link the No.6 wire to the No.1 wire of throttle mating connector