No. Part name
Procedure
Remarks
High pressure 1.Detachment
switch
1) Perform work of
①
.
2) Recover the refrigerant gas form the outdoor unit.
3) Perform work of
②
,
③
,
④
and
⑤
.
4) Remove the sound-insulation material and partition.
5) Remove the high pressure switch by the burner.
Take care that the electric parts, 4 way valve,
butyle, compressor, accum tank, heat exchanger,
and etc. are not caught by flame.
(Otherwise pperation trouble may occur.)
1.Attachment
・
Be sure not to burn lead wire of the high pressure
switch.
Adjust the temperature of the hight pressure
switch to below 100
º
C
during the brazing.
Use
the wet towel for cooling.
Use the protective plate for the brazing.
High pressure switch
Wet towel
Protective plate
⑮
- 10
8
-
FILE NO. SVM-15102
Summary of Contents for RAS-2M14S3AV-E
Page 31: ...4 1 Outdoor Unit 4 CONSTRUCTION VIEWS FILE NO SVM 15102 31 Unit mm ...
Page 116: ......