No. Part name
Procedure
Remarks
⑧
PMV coil
1.Detachment
1) Perform works from
①
to
④
.
2) Remove the coil by pulling it up from PMV body.
2. Attachment
1) When assembling the coil into the PMV body,
ensure that the coil lock is installed properly in
the pipe.
Match the identification color with PMV body and
coil.
A room unit is yellow.
B room unit is red.
C room unit is green.
<Handling precaution>
When handling the parts, do not pull the leads.
When removing the coil from the valve body, use your
hand to secure the body in order to prevent the pipe
from being bent out of shape.
⑨
Fan guard
1.Detachment
1) Perform works
①
and
②
.
2) Remove the front cabinet, and put it down so
that fan guard side directs downward.
3) Remove the hooking claws by pushing minus
screwdriver according to the arrow mark in the
right figure, and remove the fan guard.
2. Attachment
1) Insert claws of the fan guard in the holes of the
front cabinet. Push the hooking claws
(9 positions) by hands and fix the claws.
Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.
All
the
attaching
works
have
completed.
Check
that
all
the
hooking
claws
are
fixed
to
the
specified
positions.
- 10
6
-
FILE NO. SVM-15102
Summary of Contents for RAS-2M14S3AV-E
Page 31: ...4 1 Outdoor Unit 4 CONSTRUCTION VIEWS FILE NO SVM 15102 31 Unit mm ...
Page 116: ......