MEP S.p.A.
4--4
21
Use and maintenance manual
TIGER 370 CNC--MR
Anchoring the machine
The base of the machine is anchored to the floor by two permanent studs located
on the sides of the base. The studs are screwed into nuts previously sunk into the
concrete, and tightened from above with lock nuts. The schematic specifications
set out in Chapter 1 should be taken into account when positioning the machine.
2226
747,
5
Minimum requirements
For the machine to function correctly, the room in which it is to be installed must
satisfy the following requirements:
H
power supply voltage/frequency: refer to the values on the rating plate;
H
working pressure not less than 6 Bar and not greater than 8 Bar;
H
temperature of machine location: from --10 to +50
°
C;
H
relative humidity: not more than 90%;
H
lighting: not less than 500 Lux.
The machine is already protected against voltage variations, but will only run
trouble--free if the variations do not exceed
±
10%.
Check list
Before starting installation, check that all the accessories, whether standard or
optional, supplied with the machine are present. The basic version of the
TIGER
370 CNC---MR
is supplied complete with:
CHARACTERISTICS
Multi---microprocessor with two controlled axes that permits programming 32
batches of workpieces with different lengths and quantities on the same bar
n
Three---stage drive system to ensure a high level of rigidity and precision, and to
attain a great capacity for removal
n
Warning
Summary of Contents for 370 CNC--MR
Page 1: ...USE AND MAINTENANCE MANUAL YEAR OF MANUFACTURE ______________ TIGER 370 CNC MR EN...
Page 2: ......
Page 4: ......
Page 10: ......
Page 15: ...1 5 5 Introduction and technical specifications...
Page 82: ...6 15 72 Diagrams exploded views and replace...
Page 83: ...MEP S p A 6 16 73 Use and maintenance manual TIGER 370 CNC MR...
Page 84: ...6 17 74 Diagrams exploded views and replace...
Page 85: ...MEP S p A 6 18 75 Use and maintenance manual TIGER 370 CNC MR...
Page 86: ...6 19 76 Diagrams exploded views and replace...
Page 87: ...MEP S p A 6 20 77 Use and maintenance manual TIGER 370 CNC MR...
Page 88: ...6 21 78 Diagrams exploded views and replace...
Page 90: ...6 23 80 Diagrams exploded views and replace...
Page 91: ...MEP S p A 6 24 81 Use and maintenance manual TIGER 370 CNC MR...
Page 92: ...6 25 82 Diagrams exploded views and replace...
Page 93: ...MEP S p A 6 26 83 Use and maintenance manual TIGER 370 CNC MR...
Page 94: ...6 27 84 Diagrams exploded views and replace...
Page 95: ...MEP S p A 6 28 85 Use and maintenance manual TIGER 370 CNC MR...
Page 111: ...MEP S p A 6 44 101 Use and maintenance manual TIGER 370 CNC MR Fixed worktable...
Page 113: ...MEP S p A 6 46 103 Use and maintenance manual TIGER 370 CNC MR Turntable...
Page 115: ...MEP S p A 6 48 105 Use and maintenance manual TIGER 370 CNC MR Vice assembly...
Page 117: ...MEP S p A 6 50 107 Use and maintenance manual TIGER 370 CNC MR Head unit...
Page 119: ...MEP S p A 6 52 109 Use and maintenance manual TIGER 370 CNC MR Motor assembly...
Page 121: ...MEP S p A 6 54 111 Use and maintenance manual TIGER 370 CNC MR Blade guard unit...
Page 123: ...MEP S p A 6 56 113 Use and maintenance manual TIGER 370 CNC MR Electro cylinder unit...
Page 125: ...MEP S p A 6 58 115 Use and maintenance manual TIGER 370 CNC MR Supply carriage unit...
Page 127: ...MEP S p A 6 60 117 Use and maintenance manual TIGER 370 CNC MR Supply roller unit...
Page 129: ...MEP S p A 6 62 119 Use and maintenance manual TIGER 370 CNC MR Control panel...
Page 131: ...MEP S p A 6 64 121 Use and maintenance manual TIGER 370 CNC MR Guard rail...
Page 145: ...7 13 135 adjust the position of the blade in relation to the teeth as shown...
Page 179: ......
Page 180: ......