6.9.2.2
Installing the Mixing System
When
•
For highest sensitivity when mixing ripples interfere with the
detection, for example, when you use UV absorbing solvents or
solvent additives that amplify mixing ripples by interaction with the
stationary phase
•
For TFA applications
TIP
Installing a mixing system affects the gradient delay volume, dwell
volume, and ripple (see
Parts required
Optional mixer kit, comprising the mixing system and required
installation material (mounting bracket and screws)
Tools and additional items required
•
Screwdriver, Torx 10
•
Solvent suitable for purging
Preparations
1. To flush out harmful substances, purge the pump with an
appropriate solvent.
2. To remove harmful substances from the components in the flow
path after the purge unit, have the pump deliver for a short time
with the solvent that was used for purging.
3. Turn off the pump flow and wait until the system pressure is down
to zero.
Follow these steps
1. Unplug the cable of the seal wash detector from the
DROP DET
port.
2. Unplug the cable of the right pump head from the
P-WORK
port if
necessary.
3. Remove the right Y-connector (see
).
4. Remove the capillary mixer (volume: 25 µL) that connects the purge
unit and the inline filter when the pump is shipped from the
manufacturing site.
Summary of Contents for Vanquish VH-P10-A-02
Page 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...