7
•
Maintenance and Service
Vanquish Pumps (VH-P10-A-02) Operating Manual
Page 135
2. Install the new Y-connector:
First, connect the Y-connector capillaries to the outlet check valves.
Then, connect the capillary to the purge unit.
3. Purge the pump using the solvent for your application.
4. Inspect the flow connections of the Y-connector for indications of
leakage. Tighten leaky connections when the system pressure is
down to zero.
Summary of Contents for Vanquish VH-P10-A-02
Page 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...