7
•
Maintenance and Service
Page 124
Vanquish Pumps (VH-P10-A-02) Operating Manual
8. For 2 hours, apply the flow rate of your application and flush the
pump with fresh acetonitrile.
9. Connect the new solvent reservoirs, which contain fresh solvent.
10. Turn off the pump flow and wait until the system pressure is down
to zero.
11. Uninstall the backpressure capillary and reconnect the system as
required by your application.
12. Purge the pump.
13. Equilibrate the system.
7.4.3
Cleaning or Decontaminating the Pump
Cleaning and decontamination must be performed by qualified
personnel wearing suitable personal protective equipment. Always
observe national and local regulations.
NOTICE
Wipe up all liquids spilled onto the system immediately. If
surfaces are exposed for longer periods, these liquids can cause damage.
Decontamination
Decontamination is required, for example, when leakage or spillage has
occurred, or before service or transport of the pump. Use a suitable
cleaning detergent or disinfectant to ensure that the treatment renders
the pump safe to handle.
Parts required
•
Suitable cleaning detergent (or disinfectant)
•
Purified water
•
Lint-free cloths or wipes
Summary of Contents for Vanquish VH-P10-A-02
Page 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...