7
•
Maintenance and Service
Vanquish Pumps (VH-P10-A-02) Operating Manual
Page 187
7.16.1
Preparing the Pump for Transport
To prepare the pump for transport, follow these steps:
1. Perform a long-term shut down of the pump. See
section
Long-Term Shutdown, page 112
2. Turn off the pump with its main power switch and disconnect the
power cord.
3. Remove all cables and flow connections to other devices.
4. Close open flow connections with appropriate plugs, for example,
the plugs you removed when setting up the pump.
5. Pull the waste line out of the waste outlet port (see
page 64
6. Check the leak tray and drain port. If liquid is present, absorb the
liquid with a tissue.
7. Remove the pump or slide-in module from the system stack as
required:
Install the carrying handles and remove the pump from the Vanquish
system. Follow the instructions on dismounting the system stack in
the
Transporting or Shipping the System
section of the
Vanquish
System Operating Manual
.
-or-
Remove the slide-in module from the pump enclosure in the system
stack. Follow the related steps in
section 7.17 Replacing the Slide-In
8. The step depends as follows:
♦
To transport the pump to a new location, follow the instructions
in
♦
To ship the pump, follow the instructions in
section 7.16.3,
page 188
Summary of Contents for Vanquish VH-P10-A-02
Page 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Page 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...