Installation procedures
Commissioning, general
5-6
Heratherm IMP
Thermo Scientific
Commissioning, general
Installing the Shelf Support Brackets
1. Insert the shelf support bracket [3] into the perforations [1] of the support rail and tilt it
downwards.
2. Make sure that the two vertical elements [2] of the shelf support bracket butt against the
support rail.
Figure 5-7 Shelf Support Bracket Installation
Installing the Perforated Shelves
[1]
Rear Pull-out Stop
[2]
Tilt Protection Device
[3]
Front Pull-out Stop
[4]
Shelf
Figure 5-8 Perforated Shelf
1. Push the shelf [4] onto the shelf support brackets with the tilt protection devices [2] facing
the rear panel of the refrigerated incubator.
Summary of Contents for IMP 180
Page 1: ......
Page 6: ...Contents iv Heratherm IMP Thermo Scientific...
Page 8: ...List of Figures ii Heratherm IMP Thermo Scientific...
Page 40: ...Product Description Additional Tube Access Ports Option 4 14 Heratherm IMP Thermo Scientific...
Page 88: ...Handling and Control Programming 7 34 Heratherm IMP Thermo Scientific...
Page 90: ...Shut down Shutting the refrigerated incubator down 8 2 Heratherm IMP Thermo Scientific...
Page 110: ...Technical Data 13 4 Heratherm IMP Thermo Scientific...
Page 114: ...Device Log 15 2 Heratherm IMP Thermo Scientific...
Page 117: ...Contact Thermo Scientific Heratherm IMP 16 3...
Page 118: ...Contact 16 4 Heratherm IMP Thermo Scientific...