Installation procedures
Preparing the usable space
Thermo Scientific
Heratherm IMP
5-3
Installation or Removal of the Support Rails
Figure 5-3 Support Rail Installation
The embossings at [2] and [5] act as lateral guides for the support rails, while the embossings
at [1] and [6] secure the support rails in place. For the support rails to install correctly the
retaining spring [3] must be facing upwards.
1. Place the support rail [4] on the lower embossing [6] and tilt it upwards against the work
space side wall so that the rail is positioned over the two embossings at [5] and [2].
2. Clamp the retaining spring [3] behind the upper embossing [1].
3. To remove the support rails, pull the retaining spring tab down out of the embossing and
remove the support rail assembly.
Cleaning and disinfection
For details about the cleaning and disinfection of the refrigerated
incubator, please refer to
“Cleaning”
on
page
9-1
.
Summary of Contents for IMP 180
Page 1: ......
Page 6: ...Contents iv Heratherm IMP Thermo Scientific...
Page 8: ...List of Figures ii Heratherm IMP Thermo Scientific...
Page 40: ...Product Description Additional Tube Access Ports Option 4 14 Heratherm IMP Thermo Scientific...
Page 88: ...Handling and Control Programming 7 34 Heratherm IMP Thermo Scientific...
Page 90: ...Shut down Shutting the refrigerated incubator down 8 2 Heratherm IMP Thermo Scientific...
Page 110: ...Technical Data 13 4 Heratherm IMP Thermo Scientific...
Page 114: ...Device Log 15 2 Heratherm IMP Thermo Scientific...
Page 117: ...Contact Thermo Scientific Heratherm IMP 16 3...
Page 118: ...Contact 16 4 Heratherm IMP Thermo Scientific...