5 • Service
Doc. 065289-03 10/12
113
7. Connect the cable from the new leak sensor (P/N 058053) to the Dionex ICS-
1100 cable.
8. Feed the cables back inside the Dionex ICS-1100. Align the leak sensor with
the component panel opening and fingertighten the screw.
9. Make sure the leak sensor does not touch the bottom of the drip tray.
5.16 Priming the Pump
1. Verify that the eluent reservoir is filled, the reservoir cap is installed and hand
tightened, and the liquid line from the Dionex ICS-1100 to the reservoir cap is
connected.
2. Verify that the waste lines are directed to a waste container.
3. The priming procedure consists of two parts:
•
Priming the eluent lines with a syringe (see
). Perform this
procedure at initial installation, after changing eluents, or when eluent
lines are empty.
•
Priming the pump heads with the
Prime
button (see
Perform this procedure after the eluent lines are primed.
5.16.1 Priming the Eluent Lines with a Syringe
NOTE Prime the eluent lines after initial installation, after
changing eluents, or when eluent lines are empty.
1. Verify that the pump is turned off.
2. Connect a 10 mL syringe (P/N 079803) to the priming valve port on
the primary pump head (see
Summary of Contents for Dionex ICS-1100
Page 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Page 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Page 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Page 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Page 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Page 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Page 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Page 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...