5 • Service
Doc. 065289-03 10/12
93
4. Unscrew the black locking ring
on the front of the valve (see
) and remove the
ring.
5. Grasp the front of the valve pod
and pull firmly to remove it
from the Dionex ICS-1100.
Figure 5-5. Unscrew the Valve Locking Ring
6. Check that the new pod (6-port, P/N 061947; 10-port, P/N 061948) has the
correct number of ports for the valve being serviced.
7. Align the slots in the new pod with the runner in the valve holder on the
Dionex ICS-1100 (see
). Valve pods are keyed to fit only one way
(one slot is narrower than the other). Verify that the slots are aligned with their
matching runners.
8. Also verify that the two splines on the pod align with the matching splines
). If necessary, twist the end of the pod
to adjust the position of the splines.
Figure 5-6. Valve Pod and Pod Holder
Black
Locking Ring
Slot (larger)
Splines
Runner (larger)
Valve Pod
Valve Holder
Summary of Contents for Dionex ICS-1100
Page 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Page 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Page 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Page 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Page 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Page 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Page 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Page 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...