5 • Service
Doc. 065289-03 10/12
115
5.16.2 Priming with the Prime Button
NOTE Perform this procedure after priming the eluent
1. Check that the priming valve on the primary pump head is closed (see
2. Open the waste valve on the secondary pump head by turning the
knob one-quarter to one-half turn counterclockwise (see
Opening the valve directs the eluent flow path to waste and eliminates
backpressure.
3. In the
Pump Settings
), click the
Prime
button. Confirm that the waste valve is open by clicking
OK
when the
reminder message appears. The pump will begin pumping at about
3 mL/min.
4. Continue priming the Dionex ICS-1100 until no air bubbles are
exiting the pump waste line.
5. In the
Pump Settings
window, click
Pump Off
.
6. Close the waste valve.
Do not overtighten the valve.
Figure 5-24. Priming the Pump
Priming Valve
Waste Valve
Primary
Pump Head
Secondary
Pump Head
(open)
(close)
Summary of Contents for Dionex ICS-1100
Page 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Page 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Page 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Page 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Page 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Page 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Page 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Page 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...