9 Maintenance
Operations Manual
Bison 120
20-07-2018
Page 9-6
Revision 2.0
9.3 Maintenance Schedule
Every 8 Hrs of Operation
Monthly or 50 Hrs
3 Months or 300 Hrs
6 Months or 500 Hrs
Yearly or 1000 Hrs
Diesel Engine (Also see engine manual)
Engine Oil Level
- *
#
Air Filter
- *
#
Engine Oil Filter
- *
#
Diesel Filter
- *
#
Coolant
-
#
Crusher
Belt Tension
Tightening of plate clamping bolts
Greasing
Plate wear
Evacuator/ Extraction Belt
Rubber belt tension
Rubber belt mat condition
Side Sill Condition
-
Undercarrriage
Track Tension
Reducer Oil Level
# *
-
Check Tightening of roller clamping screws, traction wheels etc.
Hydraulic System
Hydraulic Oil Level
Hydraulic Oil Filters
# *
Pipe Connection Conndition
Electrical System
Light Functioning Check
Battery Liquid Check
Machine Body
Greasing
Check Condition of Safety Decals
Tightening of the Clumping Screws
Fuel Level
Vibrating Feeding Drawer
Check Of Elastic Support Condition
Tightening of Vibrator Clumping Screws
Vibrator Greasing
Radio Control (Also see Radio control Manual)
Battery Change
Connection Cable Condition Check
Check, * 1st Time Only, # Replace, - Topup, Regulation, cleaning
Summary of Contents for Evoquip Bison 120
Page 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Page 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Page 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Page 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Page 223: ......