Transportation 5
Operations Manual
Bison 120
20-07-2018
Page 5-3
Revision 2.0
5.1 Preparation Prior to Transportation
n
CAUTION
Prior to transportation always check the machine for loose or damaged components. Ensure
all loose items are carefully stowed and secured if these are to be transported on the machine.
Check that the travelling dimensions and weight of the machine will be within the regulation limits.
Before transporting the machine, observe the prescribed transport position, admissible speed and
itinerary. Only use appropriate means of transport and lifting gear of adequate capacity. Know
the overall height to avoid contacting overhead obstructions such as bridges, power lines etc.
The preparations to move equipment by an articulated lorry should be supervised by a minimum of
two persons. Ensure persons transporting the machine adhere to all safety signs and procedures.
Before transportation on public roads, ensure the machine has been properly secured with no loose
material left in or on the machine. Always observe the valid traffic regulations and, if necessary,
ensure beforehand that the machine is in a condition compatible with these regulations.
Extreme caution is required when transporting machinery on site. Soft or uneven ground may
cause accidents. On sloping terrain, always adapt your travelling speed to the relevant ground
conditions. Never change to a lower gear on a slope. Always change gear before reaching a slope.
The machine is remote controlled and may start without notice. Stay clear of the machine. The
machine must be loaded and transported only in accordance with the operating instructions.
For manoeuvring the machine, observe the prescribed transport position, admissible speed and
itinerary. Use only appropriate means of transport and lifting equipment and where applicable
of adequate capacity. The re-commissioning procedure must be strictly in accordance with the
operating instructions. Before travelling with the machine, check that the braking and any signalling
and lighting systems are fully functional. Before setting the machine in motion always check that
the accessories have been safely stowed away.
PROCEDURE
1. Prior to stopping the machine ensure that all material has been processed through the
machine.
2. Ensure that there is no material on the conveyors, feeder or in the crusher.
3. Stop the machine according to the procedure in Section 7.
4. Wash the machine to remove all debris.
5. Prior to transportation always check the machine for loose or damaged components.
6. Ensure there is no personnel on or around the machine prior to putting the machine into the
transport position and manoeuvring the machine.
Summary of Contents for Evoquip Bison 120
Page 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Page 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Page 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Page 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Page 223: ......