7 Standard Operating Procedures
Operations Manual
Bison 120
20-07-2018
Page 7-14
Revision 2.0
Figure 7.12 - Chamber Start Button
5. If fitted with optional magnetic belt, press the start button (Item 1), Reference: Figure 7.13.
This will start the magnetic belt.
Figure 7.13 - Chamber Start Button
6. On the radio remote press the vibrating drawer start button (Item 1). This will start the vibrating
drawer. The speed of which the drawer feeds the material to the chamber can be regulated
using the speed regulator (Item 2), Reference: Figure 7.14.
Figure 7.14 - Vibrating Drawer Button
7. The vibrating drawer speed can also be regulated by altering the positions of the weights on
the vibrating motors, see maintenance section.
Summary of Contents for Evoquip Bison 120
Page 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Page 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Page 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Page 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Page 223: ......