Transportation 5
Operations Manual
Bison 120
20-07-2018
Page 5-11
Revision 2.0
Figure 5.9 - Lifting Machine on Trailer
5. Ensure that all
loose items are carefully stowed and secured if these are to be transported
on the machine.
6. Using suitable lifting equipment, lift the crusher on to the back of the transporter.
7. Secure the machine using the tie down transport brackets and all loose items to the transporter.
Figure 5.10 - Transport Tie Down Points
Summary of Contents for Evoquip Bison 120
Page 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Page 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Page 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Page 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...