SCRUBBING
3-42
5400 330735 (3–01)
4. Remove the clevis from the bottom end of
the cable.
Note the amount of threads the clevis is turned
onto the existing lift cable. Install the clevis onto
the new cable in the same location.
5. Loosen the jam nut holding the squeegee lift
cable to the ball joint. Un–screw the cable
from the ball joint.
6. Pull the cable end through the cable
bushing. Remove the cable from the
machine.
Remove the balljoint end and jam nut from the
existing cable. Install the jam nut and balljoint in
the same location on the new lift cable.
NOTE: Reverse this order to install the squeegee
lift cable.
7. Operate the machine. Check the squeegee
lift cable for proper operation.
Summary of Contents for 5400
Page 1: ...330735 Rev 00 3 01 Service Manual 5400 ...
Page 4: ...GENERAL INFORMATION 1 2 5400 330735 3 01 ...
Page 16: ...CHASSIS 2 2 5400 330735 3 01 ...
Page 24: ...CHASSIS 2 10 5400 330735 3 01 ...
Page 26: ...SCRUBBING 3 2 5400 330735 3 01 ...
Page 70: ...SCRUBBING 3 46 5400 330735 3 01 ...
Page 72: ...ELECTRICAL 4 2 5400 330735 3 01 ...
Page 132: ...ELECTRICAL 4 62 5400 330735 3 01 ...
Page 137: ...ELECTRICAL 4 67 5400 330735 3 01 ...
Page 147: ...ELECTRICAL 4 77 5400 330735 3 01 ...
Page 151: ...ELECTRICAL 4 81 5400 330735 3 01 ...
Page 155: ...ELECTRICAL 4 85 5400 330735 3 01 ...
Page 161: ...ELECTRICAL 4 91 5400 330735 3 01 ...