![Teledyne CD14 User Manual Download Page 112](http://html.mh-extra.com/html/teledyne/cd14/cd14_user-manual_1080810112.webp)
Section I – CD AutoPlus Maintenance
CD14 Tester & CD AutoPlus Autosampler User Guide—75-108-800 Rev. B—31 May 2021
111 of 130
EAR99 technology subject to restrictions on cover page.
CD AutoPlus Moving and Storage
If the CD AutoPlus will not be used for a short period of time (3
days or more), the instrument should be cleaned, and the power
should be turned off. If the CD AutoPlus will not be used for an
extended period of time (30 days or more), the instrument
should be cleaned, covered, and unplugged from the power
source.
The instrument is heavy and great care should be taken when
moving it. If the instrument is moved to a new location,
revalidation should be considered.
Two people are required to lift the CD AutoPlus and/or AutoFill.
Lifting should be done with one person situated on each side of
the instrument. Remove the collection rack before moving the
instrument. Lift the equipment by the base (applies to both the
CD AutoPlus and the AutoFill).
Warning:
Lifting without assistance may cause injury.
CD AutoPlus
1.
Remove all liquid sources and program the CD
AutoPlus to pump 20 mL of air to clear as much liquid
from the system as possible.
2.
Turn the power off. Disconnect all tubing,
communication, and electrical connections from the
unit.
AutoFill
1.
Turn the power off. Remove the rack and secure the
needle arm.
2.
Disconnect all tubing, communication, and electrical
connections from the unit.