![Teledyne 7600 Operating Instructions Manual Download Page 93](http://html.mh-extra.com/html/teledyne/7600/7600_operating-instructions-manual_1080467093.webp)
Infrared Gas Analyzer
Maintenance
Teledyne
Analytical
Instruments
93
Maintenance
4.1 Routine Maintenance
Aside from normal cleaning of the instrument and making sure
connections are tight and secure, the following maintenance items
should be carried out on a daily basis.
1.
Zero and Span Calibration:
Perform a zero calibration. For the calibration
procedures, refer to Section 3.7.1
Zero Calibration
.
Then, perform span calibration. For the calibration
procedures, refer to Section 3.7.2
Span Calibration.
2.
Flowrate Check:
Sampling and purge gas flowrates are as follows:
Sampling gas flow: 0.5L/min 0.2 L/min
Purge gas flow:
About 1 L/min
Check and adjust if necessary every day.
4.2 Daily Check and Maintenance Procedures
Table 4.1 Troubleshooting and Maintenance
Item to be
checked
Phenomena Cause
Remedy
Display value
Display values are
low.
Display values are
high.
(1) Dust is
mixed in
sampling cell.
(1) Clean the
sampling cell.
Check
sampling
system
especially gas
filter.
Summary of Contents for 7600
Page 14: ...Model 7600 Teledyne Analytical Instruments xiv ...
Page 20: ...Introduction Model 7600 Teledyne Analytical Instruments 20 ...
Page 96: ...Maintenance Model 7600 Teledyne Analytical Instruments 96 Figure 4 3 Sample Cell ...
Page 108: ...Maintenance Model 7600 Teledyne Analytical Instruments 108 ...
Page 120: ...Appendix Model 7600 Teledyne Analytical Instruments 120 A 9 Description on Terminal Block ...
Page 121: ...Infrared Gas Analyzer Appendix Teledyne Analytical Instruments 121 ...
Page 122: ...Appendix Model 7600 Teledyne Analytical Instruments 122 ...
Page 123: ...Infrared Gas Analyzer Appendix Teledyne Analytical Instruments 123 ...
Page 124: ...Appendix Model 7600 Teledyne Analytical Instruments 124 ...
Page 126: ...Index Model 7600 Teledyne Analytical Instruments 126 ...