![Tektronix TDS 500C Performance Verification Manual Download Page 66](http://html1.mh-extra.com/html/tektronix/tds-500c/tds-500c_performance-verification-manual_1079136066.webp)
Performance Tests
1–50
TDS 500C, TDS 600B & TDS 700C Performance Verification and Specifications
H
Connect the output of the DC calibration generator, through a
dual-banana connector followed by a 50
W
precision coaxial cable,
to one side of a BNC T connector.
H
Connect the Sense output of the generator, through a second
dual-banana connector followed by a 50
W
precision coaxial cable,
to other side of the BNC T connector. Now connect the BNC T
connector to CH 1.
b. Initialize the oscilloscope:
H
Press save/recall Setup.
H
Press the main-menu button Recall Factory Setup.
H
Press the side-menu button OK Confirm Factory Init.
2. Confirm Main trigger system is within limits for Trigger-level/Threshold
accuracy:
a. Display the test signal:
H
Set the vertical SCALE to 200 mV.
H
Press VERTICAL MENU, then press the main-menu button
Position.
H
Set vertical position to –3 divisions (press –3, then ENTER, on the
keypad). The baseline level will move down three divisions. See
Figure 1–17 on page 1–51.
H
Press the main-menu button Offset.
H
Set vertical offset to +10 volts with the keypad. The baseline level
will move off screen.
H
Set the standard output of the DC calibration generator equal to the
offset (+10 volts). The DC test level will appear on screen. See
Figure 1–17.
b. Measure the test signal:
H
Press SET LEVEL TO 50%.
H
Press TRIGGER MENU.
H
Read the measurement results from the readout below the label
Level in the main menu, not the trigger readout in the graticule area.
Summary of Contents for TDS 500C
Page 4: ......
Page 15: ...Performance Verification Procedures ...
Page 16: ......
Page 115: ...Specifications ...
Page 116: ......
Page 132: ...Nominal Traits 2 16 TDS 500C TDS 600B TDS 700C Performance Verification and Specifications ...
Page 147: ......
Page 148: ......