Performance Tests
1–84
TDS 500C, TDS 600B & TDS 700C Performance Verification and Specifications
H
Disconnect the signal source from CH1, wait a few seconds, then
reconnect the signal.
H
CONFIRM that the TRIG’D LED is lighted and the waveform is
stable.
H
Disconnect all test equipment from the digitizing oscilloscope.
H
Press save/recall SETUP, the main-menu button Recall Factory
Setup, and the side-menu OK Confirm Factory Init.
Sine Wave Generator Leveling Procedure
Some procedures in this manual require a sine wave generator to produce the
necessary test signals. If you do not have a leveled sine wave generator, use one
of the following procedures to level the output amplitude of your sine
wave generator.
Equipment
required
Sine wave generator (Item 19)
Level meter and power sensor (Item 20)
Power splitter (Item 21)
Two male N to female BNC adapters (Item 23)
One precision coaxial cable (Item 5)
Prerequisites
See page 1–15
Summary of Contents for TDS 500C
Page 4: ......
Page 15: ...Performance Verification Procedures ...
Page 16: ......
Page 115: ...Specifications ...
Page 116: ......
Page 132: ...Nominal Traits 2 16 TDS 500C TDS 600B TDS 700C Performance Verification and Specifications ...
Page 147: ......
Page 148: ......