2B-19 Power Trim and Tilt:
Power Trim and Tilt Unit Reassembly
ZAJ6112206008
Assembly is reverse order of disassembly with special
attention to following steps.
CAUTION
• Do not reuse O-rings and seals once
removed.
Always use new parts.
• Lubricate all components and O-rings with
PTT fluid before assembly.
• Do not reuse PTT fluid, always refill with
new fluid.
Reservoir
CAUTION
When installing the reservoir, exercise care
to avoid damaging the rip of oil seal.
• Apply PTT fluid to reservoir seal, then install reservoir.
• Tighten four bolts securely.
Tightening torque
Reservoir bolt (a): 4.7 N·m (0.47 kgf-m, 3.4 lbf-ft)
Upper Eye
• Apply thread lock super 1333B to threads of upper
eye before threading it onto tilt rod.
: Thread lock cement 99000–32020 (SUZUKI
Thread Lock Super 1333B (50 g))
• Tighten upper eye to specified torque.
Tightening torque
Upper eye (a): 45 N·m (4.5 kgf-m, 32.5 lbf-ft)
Special tool
(A): 09945–69010 (PTT rod holder)
PTT Pump Assembly
• Install the check valve (1) and down-blow valve (2).
(a)
IAJ611220048-01
(a)
(A)
IAJ611220049-02
1
2
IAJ611220050-01
1
2
IAJ611220051-01
Summary of Contents for GF60A
Page 1: ...9 9 5 0 0 8 8 L 0 0 0 1 E ...
Page 8: ...00 3 Precautions ...
Page 48: ...0B 22 Maintenance and Tune Up ...
Page 236: ...1K 9 Charging System ...
Page 292: ...2B 27 Power Trim and Tilt ...
Page 336: ...K10 ...