![Suzuki GF60A Service Manual Download Page 119](http://html.mh-extra.com/html/suzuki/gf60a/gf60a_service-manual_1408873119.webp)
Power Unit Mechanical: 1D-17
25) Remove the fourteen bolts (29).
26) Lift up and remove power unit from engine holder.
Installation
Installation is reverse order of removal with special
attention to the following step.
CAUTION
Do not reuse gaskets, O-rings and seals.
Always replace with new parts.
Power unit
• Install dowel pins (1), gasket (2) and seal ring (3).
Apply water resistant grease to driveshaft splines.
: Grease 99000–25161 (SUZUKI Water
Resistant Grease (250 g))
• Install the engine holder seal (4).
NOTE
Install seal (4) with lip facing upward.
NOTE
Before installing power unit, apply sealant to
the four hatched areas shown in the
illustration at below.
: Sealant 99000–31140 (SUZUKI Bond
1207B (100 g))
29
29
29
IAJ611140114-01
29
29
29
IAJ611140115-01
1
1
2
3
IAJ611140116-01
4
IAJ611140117-01
IAJ611140118-01
Summary of Contents for GF60A
Page 1: ...9 9 5 0 0 8 8 L 0 0 0 1 E ...
Page 8: ...00 3 Precautions ...
Page 48: ...0B 22 Maintenance and Tune Up ...
Page 236: ...1K 9 Charging System ...
Page 292: ...2B 27 Power Trim and Tilt ...
Page 336: ...K10 ...