1K-7 Charging System:
Rectifier/Regulator Inspection
ZAJ6111B06006
Inspect the rectifier/regulator in the following procedures:
1) Remove the ring gear cover.
Refer to “Ring Gear Cover Removal and Installation” in Section 1D (Page 1D-2).
2) Disconnect all lead wires of rectifier/regulator.
3) Measure resistance between terminals in the combinations shown.
If measurement exceeds specification, replace rectifier/regulator.
NOTE
The values given below are for a SUZUKI pocket tester.
As thyristors, diodes, etc. are used inside this rectifier/regulator, the resistance values will differ when
an ohmmeter other than SUZUKI pocket tester is used.
Special tool
: 09930–25002 (Pocket tester)
Tester knob indication
Resistance (x 1 k
Ω
)
W
Y
1
Y
2
Y
3
B
IAJ6111B0002-02
Tester probe ( )
connection
(Black)
Tester probe ( ) (Red) connection
: Infinity
Unit: k
Rectifier and regulator resistance
IAJ6111B0003-01
Summary of Contents for GF60A
Page 1: ...9 9 5 0 0 8 8 L 0 0 0 1 E ...
Page 8: ...00 3 Precautions ...
Page 48: ...0B 22 Maintenance and Tune Up ...
Page 236: ...1K 9 Charging System ...
Page 292: ...2B 27 Power Trim and Tilt ...
Page 336: ...K10 ...