InnoVet Select
™
HF APR
Service Manual
26
2.5 Mounting Operators Console and Routing Communication Cables
NOTE:
The communication cables will be factory connected at the operator’s console.
These are the outer DB9 connections as viewed from the back of the operator’s console.
(See figure 7)
Figure 7: Rear view of operator’s console
DB9 TO POWER MOD
DB9 TO POWER MOD
DB9 TO ROLL POT ONLY
1.
Remove the two ¼-20 cap head screws and washers located in the
mounting holes at the bottom of the operator’s console. Use this hardware
to mount the operator console to the tube arm. Ensure hardware is tight.
2.
Route the “roll” potentiometer cable under of the x-ray tube and connect to
the operator’s console at the middle DB9 connector. Ensure the connection
is secure.
3
.
Route the communication cables under the tube and along side the high
voltage cables and rotor cable. Ensure the cable drape does not hinder the
movement of the vertical and roll motion of the tube assembly or the swivel
movement of the collimator. At the Power Module, the cables will plug into
H13 and H14 on the System Controller pcba. (See warning below)