![STIEBEL ELTRON Heat pumps Technical Manual Download Page 38](http://html1.mh-extra.com/html/stiebel-eltron/heat-pumps/heat-pumps_technical-manual_1376699038.webp)
38
www.stiebel-eltron.CoM
frESHwatEr StatIon
Equipment description
the freshwater station supplies one or
two residential units with hot water.
the energy is supplied by a 700 l
buffer cylinder sbP 700 operating at
a temperature of +55 °C. the primary
circulation pump is regulated via block
modulation, so that the required DHw
temperature remains as constant as
possible. the DHw circulation option
enables three time slots to be defined.
outside these times, DHw circulation
is activated by draw-off detection. An
additional sensor (option) enables the
activation of a booster heater (bGC)
inside the buffer cylinder via a zero-
volt contact.
the ready-to-use freshwater station is
pre-programmed at the factory.
Power connection
only apply voltage after filling and
venting the system to prevent the
pumps running dry. Connect the
power cable to a 230 V / 50 Hz supply
and protect it with a 10 A MCb.
DHW heating with a freshwater station
Summary of Contents for Heat pumps
Page 97: ...97 www stiebel eltron COM Notes ...
Page 110: ...110 www stiebel eltron COM Notes ...
Page 116: ...116 www stiebel eltron COM Notes ...
Page 124: ...124 www stiebel eltron COM Notes ...
Page 182: ...182 www stiebel eltron COM Notes ...
Page 183: ...183 www stiebel eltron COM Accessories for heating heat pumps ...