4-55
Processing Instructions
Operator Manual
920011-649
5. Insert test cord in insertion tube sleeve and in flaps of universal
cord port of control handle boots "A" and "B" (see Figure 4-28). Let
test cord extend approximately 51 mm (2") outside of universal
cord port (see Figure 4-28). Close control handle boots and latch.
6. Manually rotate spray arms on chamber ceiling and under
endoscope processing support to ensure they rotate freely.
7. Open Reliance CDS and verify expired Reliance dry chemistry
container is in Reliance CDS.
If not, insert expired Reliance dry chemistry container (refer to
Reliance dry chemistry package insert).
8. Close Reliance CDS and latch.
9. Push endoscope processing support back into chamber.
10. Close processor door.
11. Press
DOUBLE
touch pad
twice
to process a DOUBLE endoscope
processing cycle
without washing
(see
).
12. Let cycle proceed through HLD phase (refer to
Table 5-1, Cycle
Description Chart,
and
for
details).
If there was only residual dry chemistry in expired Reliance dry
chemistry container, an alarm sounds and display shows:
FAULT 38: Fresh dry chemistry container not detected.
FAULT 38
CYCLE DELAYED
Test Cord
Universal Cord
Port
Figure 4-28. Test Cord
Summary of Contents for P920011-649
Page 1: ...OPERATOR MANUAL Reliance EPS Endoscope Processing System 2022 03 10 P920011 649 ...
Page 2: ......
Page 13: ...xi 920011 649 Operator Manual Table of Contents ...
Page 17: ...xiv 920011 649 Operator Manual List of Tables Healthcare Capital Equipment ...
Page 25: ...1 8 920011 649 Operator Manual Safety Precautions Healthcare Capital Equipment ...
Page 45: ...3 16 920011 649 Operator Manual Component Identification Healthcare Capital Equipment ...
Page 167: ......
Page 168: ...STERIS Corporation 5960 Heisley Road Mentor OH 44060 1834 USA 440 354 2600 800 548 4873 ...